• Careers
  • Visit store
  • CONTACT US
CONTACT US

Floating Link to Bucket Pin 00093049985 to suit Hitachi EX1900 Excavators

Link To Bucket

OEM Ref: 0009-3-049985 EP; 00093049985 Geo Ref: 11527153

Geographe Enhanced Performance™ (EP) parts are specifically engineered to solve common challenges mine sites face, optimising the performance, durability, and efficiency of machinery used in mining operations.

Enhanced Performance parts incorporate advanced materials, innovative designs, and rigorous testing by enhancing the current design, offering superior resistance to wear, corrosion, and impact, resulting in extended service life and reduced downtime to achieve operational excellence.

Premature pin wear is a common challenge in Hitachi excavators, leading to extended fleet downtime for removal and reinstallation. Responding to industry demand for a more durable solution, Geographe sourced and analysed multiple OEM Pin samples to identify areas for improvement. The Enhanced Performance Floating Link to Bucket Pin (00093049985) is engineered to suit Hitachi EX1900 excavators. Built for harsh mining conditions, Geographe Enhanced Performance™ pins help reduce downtime, improve reliability, and extend the service life of excavators.
Increases fleet uptime due to enhanced component materials Reliable wear and performance Smooth integration for uninterrupted operation
  • Tick iconImproved safety
  • Tick iconReduced labour costs
  • Tick iconIncreased productivity

Technical information

OEM Part Ref0009-3-049985 EP; 00093049985
Component TypeEnhanced Performance Part
Improvement FactorsImproved safety; Reduced labour costs; Increased productivity
Geographe Ref11527153
OEMHitachi
Machine TypeExcavators
Product TypeMobile Fleet Parts
Machine ModelHitachi Excavator EX1900

When equipment failure is not an option, partner with us.

From existing products available for all type of OEM Mining Equipment to solving your unique challenges through custom design and trials, we can help.
CONNECT WITH THE GEOGRAPHE TEAM

What our customers say

Our customers are at the heart of what we do.

Discover how we’ve already transformed mining operations for Tier 1 miners across the world in our live webinar.

LEARN MORE
BP 2024 FMG Logo

“The Caterpillar Haul Truck Ball Stud Removal Tool has reduced the time to remove ball studs from 12 hours per truck to just 1 hour. The risk of damaging jacks throughout the process has also been removed. This initiative represents a significant cost and time reduction while also improving safety for our maintainers.”

- Truck Maintenance Superintendent, FMG Fortescue Metals Group

south32-removebg-preview

“Using the Geographe Ball Stud Removal Tool, the workgroup was able to separate 6 ball studs in under 15 minutes, this all done without heat or excessive stress on steering components.”

- Mobile Maintenance Supervisor, South 32